X-Ray Outpatients

X-Ray Outpatients

Time to complete

12 weeks

Budget

£512,000

Works included:

  • Demolition of internal layout including structural walls and installation of new walling
  • New mechanical services including hot, flow and return for legionella
  • New heating system with LST radiators
  • New AC installation in various areas on the ward
  • New electrical submain, DB system, small power and lighting
  • New electrical services to enable the Fluoroscopy machine to operate
  • Fire doors installed throughout
  • New vinyl cove and cap flooring
  • Nurse call, fire alarm system and fire dampers
  • New suspended ceilings throughout
  • Fire stopping works
  • Lead shielding works to walls
  • New build link corridor including foundations and superstructure

GB Contract Services were successful in tendering for the design and build of the refurbishment and remodelling of a plant room to create an X-Ray Outpatient department which included a new build link corridor at Whipps Cross Hospital.

Working with our existing supply chain and the nominated Trust suppliers including Samsung GB Contract Services produced design drawings compliant to HBNs/HTMs and building regulations.

This was signed off and the project was completed within 3 months which kept in time with the Samsung delivery of the X-Ray machine.


GET IN TOUCH