Whipps Cross ICU Refurbishment and Extension

Whipps Cross ICU Refurbishment and Extension

Time to complete

24 weeks

Budget

£2,200,000

  • Piling foundations for new 1st floor extension
  • Superstructure works including new steel frame and structural framing system for 1st floor extension
  • Demolition of internal layout and installation of new walling
  • New ICU pendants
  • New mechanical services including hot, flow and return for legionella, new AHU units to provide ventilation to the entire ward including heating and cooling, new BMS system installed
  • New electrical submain, DB system, small power and lighting
  • New UPS and IPS including to build new 60 minute enclosure on the roof
  • UPVC clad fire doors throughout
  • New vinyl cove and cap flooring
  • Bedhead trunking, nurse call, fire alarm system and fire dampers
  • New medical gas services including high flow oxygen
  • New suspended ceilings and MF ceilings throughout
  • Fire stopping works throughout the ward
  • New medical units supplied and installed

GB Contract Services were successful in tendering for the design and build of the refurbishment and extension of the ICU department at Whipps Cross Hospital.

Working with our existing supply chain and the nominated Trust suppliers GB Contract Services produced design drawings compliant to HBNs/HTMs and building regulations, compliance was a key element on this project due to it being a critical ICU department.