Poplar LTS 1st Floor Extension

Poplar LTS 1st Floor Extension

Time to complete

16 weeks

Budget

£364,000

Works included:

  • Structural investigation works
  • New block and beam floor
  • New brick and blockwork cavity perimeter walls
  • New roof trusses and slate roof covering
  • New anti-ligature specialist windows
  • New mechanical services including new underfloor heating, ventilation from heat recovery units, new AC installation in various areas
  • New electrical submain, DB system, small power and lighting
  • CCTV system installed
  • Access control extended to new areas
  • Resin installed in bedroom and whiterock cladding in the de-escalation area
  • Anti-ligature doors including anti-barricade
  • New vinyl cove and cap flooring
  • Nurse call, fire alarm system and fire dampers
  • New medical gas services including high flow oxygen
  • New suspended ceilings throughout
  • Fire stopping works

GB Contract Services were successful in tendering for the design and build of the 1st floor extension to Poplar ward at Rochford Hospital.

Working with our existing supply chain and the nominated Trust suppliers GB Contract Services produced design drawings compliant to HBNs/HTMs and building regulations, our appointed design team also produced planning drawings which we submitted to the local authority.

This was signed off and the project was completed within 5 months.