Time to complete

16 weeks

Budget

£705,000

Works included:

  • Demolition of internal layout including structural walls and installation of new walling
  • New mechanical services including hot, flow and return for legionella
  • New heating system with LST radiators
  • New AC installation in various areas on the ward
  • New electrical submain, DB system, small power and lighting
  • New electrical services to enable the Fluoroscopy machine to operate
  • Fire doors installed throughout
  • New vinyl cove and cap flooring
  • Nurse call, fire alarm system and fire dampers
  • New suspended ceilings throughout
  • Fire stopping works
  • Lead shielding works to walls

GB Contract Services were successful in tendering for the design and build of the refurbishment and remodelling of an identified office area which we constructed into a Fluoroscopy unit at Whipps Cross Hospital.

Working with our existing supply chain and the nominated Trust suppliers including Siemens GB Contract Services produced design drawings compliant to HBNs/HTMs and building regulations.

This was signed off and the project was completed within 3 months which kept in tine with the Siemens delivery of the Fluoroscopy machine’


GET IN TOUCH